Governor to ISRB Letter (121 kb)
Preliminary Engineering Report
The Preliminary Engineering Report provides a summary of the efforts undertaken to develop a preliminary alignment, as well as engineering, environmental, and cost considerations for plan implementation.
The Preliminary Engineering Report provides a summary of the efforts undertaken to develop a preliminary alignment, as well as engineering, environmental, and cost considerations for plan implementation.
Maps
Preliminary flood protection alignment maps.
Preliminary flood protection alignment maps.
Mouse River Flood Protection Plan Site
A website for dissemination and to collect information pertaining to the Mouse River Flood Protection plan currently in development.
A website for dissemination and to collect information pertaining to the Mouse River Flood Protection plan currently in development.
Available Landsat scenes have been compiled for Northcentral North Dakota. Landsat data is collected for this area once every 8 days.